AGP Picks
View all

Walker Cantonment Area gate construction project starts soon

News originally published by

DVIDS - Georgia

Members of the U.S. Army Yuma Proving Ground (YPG) workforce who use the Walker Gate for access to the installation will be rerouted starting Nov. 23, 2026.

Personnel accessing the Walker Cantonment Area will need to use either the Howard Cantonment Area gate, or the Ocotillo Road or Laguna Army Airfield access control points on Martinez Lake Road.

The detour is due to a security project at Walker Gate, explained Acting Engineering Chief Stephen Hauser with the YPG Directorate of Public Works. “This is an Army-wide physical security project. U.S. Army Yuma Proving Ground was selected as one of the sites to install active vehicle barriers.”

Hauser notes that this is the first of three being installed at YPG. Each cantonment access control point will eventually get this security upgrade.

While planners hope to mitigate backups, they are possible at the Ocotillo Gate because the access point is one lane in each direction and there’s not as much standoff room from the road as the Walker entrance. The placement of the temporary guard shack will allow up to approximately 20 cars before backing up to Martinez Lake Road.

Chief of guards Isaac Soliz explained, “At the beginning we will be observing and seeing how traffic patterns are for those trying to get access to the gate and then we will find a contingency to make things smoother for everyone.”

The plan also includes reducing traffic speeds so cars can safely turn left from Martinez Lake Road to access Ocotillo Gate.

Motorists should keep in mind that road construction is still active on Highway 95, which is currently using flaggers and a pilot car to guide traffic each way using one lane.

Imperial Dam Road will remain open to through traffic. There will be no interference accessing the Howard Gate for Main Post. Hours for the Ocotillo Gate will remain the same as the Walker Gate, which is Monday through Thursday, 4 AM to 6 PM. Laguna Gate hours are Monday through Thursday 3 AM to 9 P.M. and Friday 3 A.M. to 5 P.M.

The project is expected to take five months with completion anticipated in May 2027.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Construction Press Releases

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.